PROJECTS
Repeat Customer, Repeat Quality: Driveway Perfection in Maidstone
This project in 20 seconds
Another beautifully finished driveway completed for a repeat customer in Maidstone. This project refreshed a tired, uneven space and transformed it into a clean, durable, and modern driveway. We incorporated new surface water acco drainage to ensure that the new driveway performs as well as it looks – combining style, practicality, and longevity.
Returning to a trusted client
We were delighted to be invited back by one of our previous customers in Maidstone to carry out this driveway replacement. Having already completed other landscaping work at the property, the client knew they could rely on our team for precision, reliability, and a flawless finish.
The existing driveway had become worn and weathered, with some areas showing movement and poor drainage. The goal was to create a sleek, long-lasting surface that complemented the home’s frontage while providing excellent water management.
The work in detail
Ground preparation: We began by excavating the old driveway material and installing a solid sub-base foundation to ensure stability and prevent future movement.
Edge restraints: New kerb edging was installed to frame the area and retain the sharp layout of the driveway.
Drainage upgrade: Surface water ACO linear drainage channels were added along key points to direct rainwater away efficiently, protecting the property from pooling and runoff.
Block paving installation: A contemporary blend of Marshalls Driveline concrete block pavers in mixed grey tones was laid in a linear pattern, providing a clean, modern appearance that pairs beautifully with the home’s red brickwork.
Final sand and compaction: Once laid, the blocks were jointed with kiln-dried sand and compacted to achieve a smooth, even surface.
Every step was carefully measured and checked to ensure perfect alignment, consistent fall, and a seamless transition from the garage to the road.
The finished result
The transformation speaks for itself.
The driveway now looks sharp, modern, and in keeping with the home’s frontage.
The ACO drainage system ensures long-term protection against standing water.
The grey pavers create a timeless look with subtle contrast and depth.
The client was once again delighted with the result. Another successful project delivered on time and to our usual high standards.
Considering your own driveway upgrade?
If you’re thinking about a new driveway or outdoor surface, or looking to improve your property’s drainage, our team would be delighted to help. We design and install driveways throughout Maidstone and the surrounding areas – creating spaces that perform as beautifully as they look.
Want us to create your ideal outdoor space?
Whether you’re dreaming of a stylish patio, a lush garden retreat, or a complete landscape transformation, we’re here to make it happen. Get in touch today, and let’s bring your vision to life!
Got Questions? We've got answers
-
Yes, we design and install driveways throughout Maidstone and surrounding areas, tailoring each project to the client’s needs and property.
-
Project timelines vary, but this replacement was completed efficiently after careful excavation, ground preparation, edging, drainage installation and block laying. Most driveways are ready for use within a few days, depending on size and weather.
-
Surface-water ACO linear drainage channels were added to efficiently channel rainwater away from the driveway, preventing pooling and protecting the property’s foundations.
-
The new driveway uses Marshalls Driveline concrete block pavers in mixed grey tones, which provide a durable and stylish finish that complements the home’s brickwork.
-
Yes—our team works with you to choose colours, patterns and edging that complement your home. For this project, we selected mixed grey tones to harmonise with red brickwork.
-
Block-paved driveways are low maintenance. Regular sweeping, occasional power washing and topping up joints with kiln-dried sand will keep it looking its best. If any blocks become damaged, they can be replaced individually.
-
Project timelines vary, but this replacement was completed efficiently after careful excavation, ground preparation, edging, drainage installation and block laying. Most driveways are ready for use within a few days, depending on size and weather.